Find the rejection points before the venue does.
Enter six facts about your stand and upload the drawings. StandCheck checks them against rules taken from the DWTC and DEC venue handbooks and the ATM 2026, UITP MENA 2026, ADIS 2026 and ADIPEC 2026 organiser rules, and lists the documents you still need.
Every finding cites its clause.
Rules come from the DWTC and DEC venue handbooks and the ATM 2026, UITP MENA 2026, ADIS 2026 and ADIPEC 2026 organiser rules. Each finding quotes the clause and page it comes from. "Can't verify" means the drawings don't show enough to decide, so we don't guess. Your organiser's manual for your show and year always overrides.
What it looks at:
| Height | Ramps and access |
| Concourse and foyer limits | Double decks |
| Solid walls on open sides | Stairs and balustrades |
| Exhibits near the perimeter | Complex structure paperwork |
| Walls facing neighbours | Hanging items and rigging |
| Ceilings and roofs | Glass |
| Platforms | Fire-rated materials |
Instant on the facts. Evidence on the drawings.
Six facts
Venue, size, stand type, height, platform, deck and anything flown. You get the fact-based result on screen straight away.
Drawings read
Plans, elevations and 3D views are read sheet by sheet: wall runs on open sides, ceilings, ramps, stairs, hanging elements.
Expert-reviewed report
Every finding has a status (pass, fail or can't verify), what we saw on which sheet, the fix, and the quoted clause. Plus the documents the venue will ask for.
Pre-submission check only. Not an approval and not a structural assessment. Complex structures need a UAE-registered engineer; rigging loads are calculated by the venue's appointed rigger.