Know what your stand should cost.
Send us your contractor's quote and drawings. Within 72 hours you get every line priced against real UAE build costs, and a list of what to negotiate.
Three steps. One number you can take to the contractor.
You keep your contractor. We sit on your side of the quote and tell you, line by line, what is fair and what to ask about.
Upload quote and drawings
PDF, Excel or photos. Add the venue, show and stand size. Everything is covered by an NDA.
We price every line
Quantities checked against the drawings, rates against our UAE cost database, scope gaps and venue charges flagged.
You negotiate with evidence
A numbered list of findings, the benchmark behind each one, and the exact question to ask your contractor.
7 findings. AED 29,750 negotiable.
This is what you get back: the line item, the quoted figure, our benchmark and the reason. Yellow flags the line, lime confirms it.
| # | Line item | Qty | Quoted | Benchmark | Status |
|---|---|---|---|---|---|
| 01 | Raised floor, 50 mm, laminate | 54 m² | AED 9,720 | AED 8,100 | QTY ON DRAWING: 45 |
| 02 | Carpet, needle-punch | 54 m² | AED 95/m² | AED 52–60/m² | RATE HIGH |
| 03 | Rigging, 6 × 1 m fabric banner | 2 | AED 7,800 | AED 3,900 | DUPLICATED |
| 04 | Graphics, SEG lightbox 3 × 2.5 m | 2 | AED 6,400 | AED 6,000–6,800 | ✓ IN RANGE |
Illustrative example with placeholder rates, not a real audit. Real audits are anonymised before we publish them.
Every line, checked.
Quantities against drawings
Floor areas, wall runs, graphics and lighting counted from the plans and elevations, not taken from the quote.
Rates against real build costs
Carpentry, finishes, graphics, AV, rigging and electrics priced against what UAE contractors actually pay.
Scope gaps and duplicates
Items quoted twice, items missing that will appear as extras on site, and vague "site services" lines that need a breakdown.
Venue rules and charges
Height, open-side walls, rigging and double-deck rules for DWTC, Expo City, ADNEC and Sharjah, run through StandCheck.
We are paid when you save, not when you spend.
Prices in AED, excluding VAT.
- Every line priced and benchmarked
- Quantities checked against drawings
- Negotiation list with evidence
- Report within 72 hours
- Sourced venue and show rules
- Drawings read sheet by sheet
- List of documents you still need
- Report within 24 hours
- StandCheck on every design
- Priority turnaround
- One invoice a month
Built by someone who has priced them.
Years inside a UAE design and build contractor. We know what carpentry, graphics, rigging and AV actually cost in this market, and we earn nothing from the build.
We always
- Work only for the exhibitor
- Show the evidence behind every number
- Charge a flat fee plus a share of signed-off savings
- Sign an NDA on every quote we see
We never
- Take commission from contractors
- Recommend a contractor for a fee
- Audit a quote we have a stake in
- Call a saving real before the contractor signs it off
Before you upload
Will my contractor know you audited the quote?
Only if you tell them. We never contact your contractor. You decide how to use the findings.
What if you find nothing to save?
Then you sign with confidence and you only pay the flat fee. The share of savings applies only to savings your contractor agrees to in writing.
Which venues do you cover?
Dubai World Trade Centre, Dubai Exhibition Centre at Expo City, ADNEC Abu Dhabi and Expo Centre Sharjah. Other GCC venues on request.
What happens to my files?
They are stored privately, used only for your audit, and deleted on request. See the privacy notice.
Is StandCheck an approval?
No. It is a pre-submission check against public venue rules. The organiser's manual for your show and year always overrides it, and complex structures still need a UAE-registered engineer.